A building materials manufacturer began having quality problems with their product. The manufacturer determined that it would no longer be able to recycle process water. However, the manufacturer had no means to release the water to a municipality for disposal. The plant faced shutting down if the water could not be removed from the process. Industrial Hydro-Blast provided over 300,000 gallons of storage and began transferring the process water into temporary storage tanks. For two months, Industrial Hydro-Blast personnel transferred the water into the storage tanks and loaded trucks carrying the material to a waste water treatment facility. The facility never lost production due to excess water that was being generated by their process.