Rising flood waters contaminated the water supply for a Southern City with a population over 100,000 leaving the citizens without potable water. After two weeks of trying to remove the sediment and contaminated water from the plant, the local water works contacted Industrial Hydro-Blast to assist with the project. Around the clock operations were set-up utilizing dredge pumps and water blasters to clean the settling basins. Vacuum trucks were used to clean many of the water treatment tanks at the facility. The water treatment plant was operating within two weeks and potable water returned to the citizens.